Retaining structures
Shotcrete, blockwork and reinforced concrete retaining walls, footings and starter bars, repair of failing walls.

Councils & Government
DEKA repairs and reinstates the concrete and masonry structures that carry water through the suburbs: open channels, creek walls, culverts, headwalls and retaining structures. Shotcrete is our primary method, delivered with our own crews and plant.
Channel & watercourse works
Scour, undermining, spalled lining and failed joints are the usual conditions we are asked to address along urban watercourses. Shotcrete lets us reinstate a structural lining against an irregular existing wall, around pipe penetrations and below the typical waterline, without the formwork and access that conventional concrete would need in a confined channel.
Each job is scoped on site, documented with marked-up photographs and priced as a lump sum with a written exclusions schedule, so an asset officer can see exactly what is included before approving it.

Wider civil capability
Councils rarely need only one trade. DEKA's in-house disciplines let one contractor take a work order from demolition through to reinstatement.
Shotcrete, blockwork and reinforced concrete retaining walls, footings and starter bars, repair of failing walls.
Removal and replacement, trip-hazard rectification, kerb and gutter, pram ramps and driveway crossovers.
Slabs, hardstand, line-marking preparation, surface drainage and reinstatement around services.
Spalling and concrete cancer repair, exposed reinforcement treatment and structural crack repair on council buildings and structures.
Pit and pipe reinstatement, surface drainage rectification and connections to existing infrastructure.
Refurbishment and make-good to council facilities, fencing, landscaping, irrigation and drainage to reserves.

Working for procurement
We understand that the person raising the work order needs documentation as much as workmanship. Every DEKA engagement comes with a site-specific safe work method statement, risk assessment and inductions, and certificates of currency can be lodged directly into your contractor management system.
DEKA is available for minor works and maintenance panels, schedule-of-rates arrangements, quoted works and formal tenders. Where a job sits below a tender threshold, we can price it from a site walk and photographs within days.
Next step
Send the location and a few photographs. We will inspect it, document the condition and provide a lump-sum price with a written scope.